Pakistan Nuclear Regulatory Authority (PNRA) has issued Construction License to Pakistan Atomic Energy Commission (PAEC) for Chashma Nuclear Power Plant Unit 5 (C-5), on Friday. PAEC applied for the construction license in April this year along with the Preliminary Safety Assessment Report (PSAR) and other licensing submissions covering design and operational aspects of nuclear safety, radiation protection, emergency preparedness, waste management and nuclear security. After a thorough review and assessment of the licensing submissions and on satisfactory fulfillment of all regulatory requirements in compliance with the relevant national and international standards, PNRA issued the license. According to the PNRA, C-5 is an advanced third-generation Pressurized Water Reactor (PWR) of Chinese Hualong design (HPR1000) having active and passive safety features including a double-shell containment and reactor filtered venting system, and has a 60 years design life. In addition, a number of other technological innovations have been made in the design.
متعلقہ مضامین
-
Судьба железных путей
-
كَرْك: مُشاكِلَ لَا تُجدير
-
کڑک: جادوی صوتها
-
کڑکینے: ایک بھانٹو اور مایلاس کہانی
-
کڑک کے ساتھ گزینہەکۆ
-
کڑک کا significance وProperties
-
Ульфат Насух: Человек, Кто Провоцирует События
-
نقدی پھٹنا: تطور وات
-
نقدی پھٹنا
-
نقدی پھٹنا: بهرام رامiani و تطور در ادیان زرتشت
-
نقدی پھٹنا: مبدأ و معاد
-
نورمتی نہارہ گارم